Earned Value & Performance
Connect contracted scope, earned value, and earned schedule to the finish goal.
Not assignedEvidence detailsChecking
Earned Value & Performance content
No earned evidence yet: declare a scope and calculate to read position.
Shared Directed EV vocabulary keeps this scope consistent across surfaces.
Declare the unit meaning and weighting basis before treating EV as decision-grade.
Select a review for evidence.
Select prefixes or discipline.
Select a scope and review.
Choose a review to read its calculation scope.
Select a review to compare PV, EV, and AC.
Ceiling: signal—not cause, responsibility, or a committed finish date. Missing values remain unavailable; they are never replaced with zero.
PV planned value, EV earned value, and AC actual cost remain separate cumulative series. A line is absent when its evidence is missing.
The cost curve needs at least two evaluated snapshots.
Evidence boundary: cumulative cost position by Data Date; this is not a forecast, causation, or responsibility finding.
Bounded, evidenced, and expiring; Green must be earned. No report is not a zero report.
Completeness, liveness, and attestation remain explicit checks.
Select a review to inspect requirements.
Authority ceiling: closure licenses only the bounded observation set; it does not certify completion, cause, responsibility, or entitlement.
Each activity’s weighted steps beside the physical percent it reports. A missing step value is withheld, never taken as zero.
Select a review to compare claimed progress with its steps.
Parallel families, ordered movement, cross-checks, declared boundaries, and anchored discussion questions. No aggregate project score.
Choose a project to load the bounded KPI mosaic.
Width represents schedule estimates on one basis. A decrease does not prove installed accomplishment, earned value or a finish forecast.
Two reviews with different Data Dates are needed before the remaining-work snapshot comparison can render.
Inspect quantities, reductions and source receipts
The Performance PDF and Excel exports carry these same evidence tables.
Observed schedule reserves and option types. Liquidity is an asset classification—not measured conversion time or execution capacity.
Choose a project with saved reviews. One review shows levels; two reviews are required for motion.
Two disturbances that read on performance: every open activity at lower productivity, and the crash share recovery may use taken away. Read through the three questions they test. A counterfactual on this schedule's own logic, not a forecast.
Choose a review to read its stress tests.
Velocity is not direction. A period can complete a great deal of work and move the finish not at all, because the work it completed was not the work holding the finish.
Choose a project with two or more saved reviews to read its heading.
Dollar SV fades to zero as PV converges on BAC, so a late project can still report SV = 0. Earned Schedule restates it in time: SV(t) = ES − AT stays negative while the finish is late.
SV(t) ≥ 0 and SPI(t) ≥ 1.0; read position before movement.
SV(t) = 0
- PositionSV(t)ES − ATweeks · 1 sample
≥ 0 ahead; < 0 behind
- MomentumdSV/dtChange in SV(t)weeks/week · 2 samples
+ regain; − lose
- Changed²SV/dt²Change in velocityweeks/week² · 3 samples
+ improve; − deteriorate
- Persistenced³SV/dt³Change in accelerationweeks/week³ · 4 samples
Trigger, never verdict
ES = planned week at earned fraction; AT = elapsed time; SPI(t) = ES / AT.
Conditional estimate: IEAC(t) may produce a Forecasted Finish Date when the same review and scope pass every evidence gate; it is never a promise or P6 writeback.
Reading ES, SV(t), and SPI(t) from the saved reviews. Two reviews at different Data Dates are the minimum.
Compare schedule cost observations by Data Date. Unchanged totals do not prove stale accounting; CSV receipt time does not establish a cost period.
Choose a project version in the header.
Crew utilization and resource capacity
Modelled assignment demand divided by declared capacity. Near full starts at 80%; this is not measured usage, a verified P6 calendar, or resource leveling. Resource names may identify people.
Choose a project version, then read its resource evidence.
Planned and forecast columns are models: each activity’s cost spread over its span on its own working calendar. Actual cost is one figure at the Data Date; the file does not date it by month.
| Month | Planned | Planned to date | Forecast remaining | Forecast cumulative |
|---|---|---|---|---|
| Choose a project version in the header. | ||||
Across releases
| Release · Data Date | Budget | Moved | Planned through | Planned by the latest month | Evidence |
|---|
Enter the original budget and choose your change log (CSV with a header row, or JSON). The original plus approved changes is set beside the budget this version is cost-loaded with, as a plain difference. No business record is saved. Downloads record an artifact receipt.
The finish, the schedule index and progress, each worked out by two routes that share no arithmetic. Agreement raises confidence; a difference is a question to ask, and its size is shown.
| Question | Route A | Route B | Difference | Verdict |
|---|---|---|---|---|
| Choose a project version in the header. | ||||
Source and calculation evidence
The same releases read under every declared way of measuring progress, weighting the plan and drawing the green line, against the earliest release and the designated baseline, and the latest release rescheduled under each way of computing total float and counting lags. It counts how many read green; it does not say which is right and is not a forecast.
| Plan | Progress read as | Plan weighted by | Green line | SV(t) | Reads |
|---|---|---|---|---|---|
| Choose a project version in the header. | |||||
Total float on the latest release
| Total float as | Lags counted on | Green line | Least open float | Reads |
|---|---|---|---|---|
| Choose a project version in the header. | ||||
Only reading order changes. Values, citations, authority, and review provenance stay fixed.
Reactions are observations; they never change the champion by themselves.
Review status and evidence steps
Steps of the decision on this page.